This project demonstrates Malus Robotics' capability to design, simulate, validate, and commission a complete automotive assembly line using advanced PLC programming, robotics integration, and digital twin–based virtual commissioning methodologies.

IndustryAutomotive Manufacturing
System TypeRobotic Assembly Line
Execution ModeVirtual Commissioning + On-Site Deployment
Automotive assembly line automation

Project Status

Delivered & Operational

Project Summary

The automotive assembly line was engineered to support high-volume production with strict quality and safety requirements. Malus Robotics delivered a fully integrated automation system by combining robotics, PLC control, and digital twin validation. Virtual commissioning was employed extensively to test logic, sequencing, safety behavior, and robot coordination prior to physical deployment, significantly reducing commissioning risk and on-site downtime.

Industry

Automotive Manufacturing

System Type

Robotic Assembly Line

Execution Mode

Virtual Commissioning + On-Site Deployment

Project Objectives

  • Reduce on-site commissioning time and production ramp-up risk
  • Validate PLC logic and robot coordination before installation
  • Optimize robot paths, cycle times, and station balancing
  • Ensure safety compliance and fault-free system behavior
  • Deliver a scalable and future-ready automation architecture

Scope of Work

  • PLC programming and control logic development
  • Robot offline programming and teaching
  • Digital twin creation using 3D simulation
  • HMI and SCADA functional validation
  • Safety PLC integration and testing
  • Cycle time and throughput optimization
  • Virtual commissioning and simulation testing
  • On-site commissioning and production stabilization

System Architecture

PLC: Industrial PLC with integrated safety

Robots: Multi-axis industrial robots

Drives & Motion: Servo-controlled motion systems

Sensors & IO: Distributed IO and safety devices

Simulation Platform: WinMOD + 3D simulation tools

Digital Twin: PLC-coupled behavior model

Communication: TCP/IP, OPC UA

Validation: Collision, reach, and logic testing

Engineering Process

  1. 01
    Requirement analysis and system definition
  2. 02
    3D layout development and digital twin creation
  3. 03
    PLC and robot program integration
  4. 04
    Functional, safety, and sequence testing
  5. 05
    Virtual commissioning and optimization
  6. 06
    On-site commissioning and production support

Results & Benefits

Significant reduction in on-site commissioning time

Early detection of logic and sequencing issues

Improved robot cycle times and throughput

Stable and reliable system behavior at start-up